Compare building options on the same service boundary
An attractive total means little if the options do different jobs.
Define a common service
Before comparing two plant systems, describe the required output, operating hours, space constraints and study period. Keep those requirements identical across options. If one option supplies additional functionality, show it separately rather than allowing an unexplained difference to decide the result.
Map the cost boundary
Create rows for acquisition, installation, operation, planned maintenance, replacement and end-of-period treatment. State whether tax, financing and disruption costs are included. A blank cell should mean “not estimated” or “not applicable”, with the distinction written down. It should not silently mean zero.
Keep a source beside each number
Use a source register with quotation date, coverage, price basis and exclusions. Separate a contractor quotation from an internal assumption. If one quotation includes installation and another does not, normalise them before comparing totals. Retain the original quotations so the adjustment can be reviewed later.
Review differences before totals
Ask a colleague to inspect the scope table without showing the preferred option. Resolve unequal assumptions first. EU Level(s) provides a public reference for life-cycle cost reporting; this editorial worksheet is a practical starting point and does not claim conformity with a complete assessment standard.