Cileccta Review

Field guides

Show replacement timing instead of hiding it in an average

Two equal annual allowances can describe very different cash needs.

Cileccta Review Editorial · Published 4 November 2026

Place events on a timeline

For a fictional component, record inspection, routine maintenance, major overhaul and replacement as separate events. Assign the expected year and state the reason for that assumption. A straight annual allowance is useful for some budgets but conceals the timing of a large cash requirement.

Make the study end explicit

If a component is replaced near the end of the comparison period, decide how the remaining service potential is treated. Apply the same method to all options and explain it. Do not deduct an arbitrary residual value simply to make a preferred option cheaper. If there is no defensible estimate, show a range or a separate scenario.

Test a shorter service life

Keep the base case, then change the uncertain replacement year while leaving other assumptions visible. Record whether the option ranking changes. If a modest change reverses the decision, the procurement team needs better evidence about service life or a plan that tolerates that uncertainty.

Keep budgeting and evaluation distinct

A discounted comparison and an annual cash budget answer different questions. Retain both if the organisation needs both. State the price date, whether amounts are real or nominal, and the discount convention. The worked timeline is an analytical aid; an actual building decision needs project-specific professional input.

Reference shelf

References provide background. The working methods and fictional examples here are our editorial guidance, not an endorsement by the referenced organisations.

Put this into practice: open the worksheet →


Continue reading