Cileccta Review

Operation and maintenance

Record component service life as an assumption you can review

Cileccta Review · Published 4 November 2026 · Original editorial guide

Document the evidence behind a replacement year: component condition, operating environment, maintenance and the limits of the estimate.

Identify the actual component

A row labelled heating plant is too broad for a useful replacement assumption. Record the equipment or assembly, installation date where known, observed condition and what the proposed replacement includes. Separate a component change from a complete system renewal. Write unknown dates as unknown rather than back-calculating an installation year from appearance.

Ask what the quoted lifetime describes

A warranty period, a manufacturer's design statement and a site inspection answer different questions. Keep the original wording and conditions in the evidence file. Record the operating environment and maintenance requirements attached to the statement. Do not turn a warranty expiry date into an automatic replacement date.

Describe the conditions in your building

Collect operating hours, duty, exposure, service records and condition observations. Ask the person responsible for the asset to identify recurring faults and access constraints. Use those records to explain the proposed timing. If inspection evidence is missing, flag the timing as an assumption requiring review.

Keep the assumed year and its reason together

A useful record has separate fields for the base-case year, evidence date, source, author of the estimate, relevant conditions and next review. Add an earlier-event scenario with a stated purpose. It is a stress test, not a probability forecast. Preserve both scenarios so the effect on the decision stays visible.

Review the consequence of an earlier event

Move only the replacement event in the first test and keep other inputs unchanged. Then review any linked changes, such as increased maintenance before replacement, in a second labelled scenario. This sequence shows whether the decision changes because of timing alone or because the whole operating plan changed.

Use inspection to improve the decision

When the comparison depends on one unverified year, commission the relevant condition review before committing to procurement. Give the reviewer the exact question and component boundary. The output needed is an evidence-backed timing assumption with conditions, not an unsupported precise lifetime for every component.